Free UK delivery on all orders
Lowest Price Guarantee
30 Days Returns









Outsunny Walk-in Greenhouse for Outdoors with Steel Frame, Large Plant House with Roll-up Door and PE Ground Cover, White
- 700+ orders delivered
- Secure checkout
Use code GARDEN10 at checkout
Product Overview
Does unpredictable weather ruin your gardening plans and leave your plants vulnerable? The fear of a sudden storm destroying your delicate sprouts can be disheartening. Greenhouse from Outsunny offers a spacious 160 x 160 x 200 cm sanctuary. Its reinforced steel frame provides robust stability against the wind, while three mesh windows and a large roll-up door in this Outsunny small greenhouse ensure your plants breathe easy, giving you peace of mind and a flourishing garden.
Features:
- This spacious 160W x 160D x 200H cm walk-in greenhouse offers generous room for tall plants
- Features a reinforced steel frame with ground stakes and ropes for wind resistance
- A large roll-up door and three windows ensure excellent ventilation and easy access
- The water-repellent PE cover protects your plants from wind and rain
- Includes a ground sheet to effectively prevent weed growth and keep the inside clean
- Suitable for your garden or patio, designed for an enhanced gardening experience
- Assembly required
Specification:
- Colour: White, Dark Green
- Material: Steel, PE
- Overall Dimension: 160W x 160D x 200H cm
- Window Dimension: 40W x 40H cm, 50/34W x 40H cm
- Door Dimension: 160W x 194H cm
- Windproof: Level 4 (wind speed below 17.5 mph)
- Item Label: 84H-555V00WT
Package Includes:
- 1 x Greenhouse
- 4 x Guy rope
- 4 x Ground Stake
- 1 x Manual
Shipping & Delivery
Free UK delivery on every order — no minimum spend. Standard delivery 2-3 working days from our UK warehouses. Orders placed before 2pm ship same-day where possible.
Tracking details are emailed as soon as your order ships. Delivery is contactless to your door.
30-Day Returns
30 days, no fuss. If it's not right, send it back within 30 days for a full refund. Items must be unused and in original packaging.
Easy UK returns — email support@wisegalleria.co.uk and we'll arrange collection.
About the Brand
Brand details appear here.

Outsunny specialises in outdoor and garden furniture — rattan sets, gazebos, patio heaters, fire pits, greenhouses, and more. Designed for UK weather with weather-resistant materials and UV-protected finishes.
Frequently Asked Questions
Is delivery really free?
How long does delivery take?
What's the returns policy?
Do you offer Klarna?
How do I track my order?
Customer Reviews
Pairs well with

Outsunny Walk-in Greenhouse for Outdoors with Steel Frame, Large Plant House with Roll-up Door and PE Ground Cover, White
If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, within 24 hours on weekdays.
-
Delivery information
-
Contact us
-
FAQs










